Current Status

Progress status as on
01st Apr 2025

Excavation: 382/437

PCC: 382/437

Raft: 382/437

Columns upto Plinth: 382/437

Grade Slab: 182/437

Ground Floor Slab: 177/437

First Floor Slab: 171/437

Terrace Floor Slab: 163/437